| Mfr. #: | EVM430-FR6989 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | EVAL MOD FLOW METER MSP430FR6989 |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | EVM430-FR6989 Scheda dati |


Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product The Reference Design, Flow Meter is the Main-Purpose. Primary-Attributes: - IC package type: MSP430FR698x This product operates at a 3.3 V supply voltage for reliable performance. This product is an Water meter reference design - extended scan interface (ESI) enabled ultra-low power MSP430FR6989. This tool is designed for the MSP430FR6989. I2C SPI UART USB interface type Processor Core: MSP430 The 16 bit.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EVM430-FR6989 Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Kits.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Reference Design, Flow Meter.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is -.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is MSP430FR698x.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 3.3 V.
A: At what frequency does the Description-Function?
Q: The product Description-Function is Water meter reference design - extended scan interface (ESI) enabled ultra-low power MSP430FR6989.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is MSP430FR6989.
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is I2C SPI UART USB.
A: What is the Core of the product?
Q: The Core of the product is MSP430.
A: At what frequency does the Data-Bus-Width?
Q: The product Data-Bus-Width is 16 bit.