DRV8846EVM

Mfr. #: DRV8846EVM
Produttore: Texas Instruments
Descrizione: EVAL BOARD FOR DRV8846
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DRV8846EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8846EVM Overview

Product belongs to the DRV8846 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8846 amplifier. The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: Dual Full-Bridge (H-Bridge) Driver IC package type: DRV8846 This product is an Evaluation board for dual H-bridge stepper motor driver. This tool is designed for the DRV8846. USB interface type Input Voltage Range: 4 V to 18 V

DRV8846EVM Image

DRV8846EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8846EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8846
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8846
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes Dual Full-Bridge (H-Bridge) Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8846
  • Description-Function Evaluation board for dual H-bridge stepper motor driver
  • Tool-Is-For-Evaluation-Of DRV8846
  • Interface-Type USB
  • Input-Voltage 4 V to 18 V

DRV8846EVM

DRV8846EVM Specifications

DRV8846EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DRV8846

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV8846.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control, Stepper.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Dual Full-Bridge (H-Bridge) Driver.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8846.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation board for dual H-bridge stepper motor driver.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8846

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 4 V to 18 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
73,50 USD
73,50 USD
10
69,82 USD
698,25 USD
100
66,15 USD
6 615,00 USD
500
62,48 USD
31 237,50 USD
1000
58,80 USD
58 800,00 USD
Top