DRV8839EVM

Mfr. #: DRV8839EVM
Produttore: Texas Instruments
Descrizione: EVAL BOARD FOR DRV8839
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DRV8839EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8839EVM Overview

Product belongs to the DRV8839 series. This product is categorized as Evaluation Modules Type: Gate Drivers Bulk is the packaging method for this product This product is designed DRV8839 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Brush DC Motors IC package type: DRV8839 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product is an Complete solution for evaluating the low voltage brushed DC motor driver. This tool is designed for the DRV8839. USB interface type Input Voltage Range: 3.3 V Output current: 1.8 A

DRV8839EVM Image

DRV8839EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8839EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8839
  • Product Evaluation Modules
  • Type Gate Drivers
  • Packaging Bulk
  • For-Use-With DRV8839
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Brush DC Motors
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8839
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Description-Function Complete solution for evaluating the low voltage brushed DC motor driver
  • Tool-Is-For-Evaluation-Of DRV8839
  • Interface-Type USB
  • Input-Voltage 3.3 V
  • Output-Current 1.8 A

DRV8839EVM

DRV8839EVM Specifications

DRV8839EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DRV8839.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Gate Drivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is DRV8839.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Brush DC Motors

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8839.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Complete solution for evaluating the low voltage brushed DC motor driver

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8839.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 3.3 V

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 1.8 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
37,50 USD
37,50 USD
10
35,62 USD
356,25 USD
100
33,75 USD
3 375,00 USD
500
31,88 USD
15 937,50 USD
1000
30,00 USD
30 000,00 USD
Top