DRV8701EVM

Mfr. #: DRV8701EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MOD DRV8701
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DRV8701EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8701EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed MSP430G2553 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Single-H-Bridge Driver IC package type: DRV8701 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product is an Full bridge brushed DC motor gate driver evaluation module. This tool is designed for the DRV8701. USB interface type Input Voltage Range: 5.9 V to 45 V

DRV8701EVM Image

DRV8701EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8701EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With MSP430G2553
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Single-H-Bridge Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8701
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Description-Function Full bridge brushed DC motor gate driver evaluation module
  • Tool-Is-For-Evaluation-Of DRV8701
  • Interface-Type USB
  • Input-Voltage 5.9 V to 45 V

DRV8701EVM

DRV8701EVM Specifications

DRV8701EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed MSP430G2553

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Single-H-Bridge Driver

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8701

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 125 C.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Full bridge brushed DC motor gate driver evaluation module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8701.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 5.9 V to 45 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
73,50 USD
73,50 USD
10
69,82 USD
698,25 USD
100
66,15 USD
6 615,00 USD
500
62,48 USD
31 237,50 USD
1000
58,80 USD
58 800,00 USD
Top