DRV593EVM

Mfr. #: DRV593EVM
Produttore: Texas Instruments
Descrizione: EVAL MOD FOR DRV593
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DRV593EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV593EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Gate Drivers The Power Management, Half H-Bridge Driver (Internal FET) is the Main-Purpose. Primary-Attributes: - IC package type: DRV593 This tool is designed for the DRV593 DRV594. Input Voltage Range: 2.8 V to 5.5 V

DRV593EVM Image

DRV593EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV593EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Gate Drivers
  • Main-Purpose Power Management, Half H-Bridge Driver (Internal FET)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part DRV593
  • Tool-Is-For-Evaluation-Of DRV593 DRV594
  • Input-Voltage 2.8 V to 5.5 V

DRV593EVM

DRV593EVM Specifications

DRV593EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Gate Drivers.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Half H-Bridge Driver (Internal FET).

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV593.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV593 DRV594

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 2.8 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
148,50 USD
148,50 USD
10
141,08 USD
1 410,75 USD
100
133,65 USD
13 365,00 USD
500
126,22 USD
63 112,50 USD
1000
118,80 USD
118 800,00 USD
Top