DRV591EVM

Mfr. #: DRV591EVM
Produttore: Texas Instruments
Descrizione: EVAL MOD FOR DRV591
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DRV591EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV591EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Gate Drivers Bulk is the packaging method for this product The Power Management, Half H-Bridge Driver (Internal FET) is the Main-Purpose. Primary-Attributes: +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode IC package type: DRV591 This tool is designed for the DRV591VFP. Input Voltage Range: 2.8 V to 5.5 V

DRV591EVM Image

DRV591EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV591EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Gate Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Half H-Bridge Driver (Internal FET)
  • Primary-Attributes +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode
  • Embedded No
  • Utilized-IC-Part DRV591
  • Tool-Is-For-Evaluation-Of DRV591VFP
  • Input-Voltage 2.8 V to 5.5 V

DRV591EVM

DRV591EVM Specifications

DRV591EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Gate Drivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Half H-Bridge Driver (Internal FET).

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV591.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV591VFP.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 2.8 V to 5.5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
19,04 USD
19,04 USD
10
18,08 USD
180,83 USD
100
17,13 USD
1 713,15 USD
500
16,18 USD
8 089,90 USD
1000
15,23 USD
15 228,00 USD
Top