DRV421EVM

Mfr. #: DRV421EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE DRV421
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DRV421EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV421EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Magnetic Sensors Bulk is the packaging method for this product Sensitivity: - Interface: - Voltage Supply Range: 3 V ~ 5.5 V Current Sensor Sensing range of - Included item: Board. IC package type: DRV421 This product operates at a 3 V to 5.5 V supply voltage for reliable performance. This product is an DRV421 losed-loop current sense conditioner with integrated fluxgate sensor. This tool is designed for the DRV421.

DRV421EVM Image

DRV421EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV421EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Magnetic Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface -
  • Voltage-Supply 3 V ~ 5.5 V
  • Sensor-Type Current Sensor
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part DRV421
  • Operating-Supply-Voltage 3 V to 5.5 V
  • Description-Function DRV421 losed-loop current sense conditioner with integrated fluxgate sensor
  • Tool-Is-For-Evaluation-Of DRV421

DRV421EVM

DRV421EVM Specifications

DRV421EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Magnetic Sensors.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed -

  • A: At what frequency does the Interface?

    Q: The product Interface is -.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 3 V ~ 5.5 V

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Current Sensor.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV421.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3 V to 5.5 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed DRV421 losed-loop current sense conditioner with integrated fluxgate sensor

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV421.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
73,50 USD
73,50 USD
10
69,82 USD
698,25 USD
100
66,15 USD
6 615,00 USD
500
62,48 USD
31 237,50 USD
1000
58,80 USD
58 800,00 USD
Top