DAC8581EVM

Mfr. #: DAC8581EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR DAC8581EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DAC8581EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8581EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8581.

DAC8581EVM Image

DAC8581EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8581EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8581

DAC8581EVM

DAC8581EVM Specifications

DAC8581EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8581.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
91,77 USD
91,77 USD
10
87,18 USD
871,82 USD
100
82,59 USD
8 259,30 USD
500
78,00 USD
39 002,25 USD
1000
73,42 USD
73 416,00 USD
Top