DAC7654EVM

Mfr. #: DAC7654EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR DAC7654
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DAC7654EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC7654EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC7654.

DAC7654EVM Image

DAC7654EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC7654EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC7654

DAC7654EVM

DAC7654EVM Specifications

DAC7654EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC7654

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top