DAC7631EVM

Mfr. #: DAC7631EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR DAC7631
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DAC7631EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC7631EVM Overview

This product is categorized as Evaluation Boards Type: DAC This product operates at a 4.5 V to 18 V supply voltage for reliable performance. This tool is designed for the DAC7631.

DAC7631EVM Image

DAC7631EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC7631EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 4.5 V to 18 V
  • Tool-Is-For-Evaluation-Of DAC7631

DAC7631EVM

DAC7631EVM Specifications

DAC7631EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 4.5 V to 18 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC7631.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
76,32 USD
76,32 USD
10
72,50 USD
725,04 USD
100
68,69 USD
6 868,80 USD
500
64,87 USD
32 436,00 USD
1000
61,06 USD
61 056,00 USD
Top