DAC7558EVM

Mfr. #: DAC7558EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR DAC7558
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DAC7558EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC7558EVM Overview

This product is categorized as Evaluation Boards Type: DAC This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC7558.

DAC7558EVM Image

DAC7558EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC7558EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC7558

DAC7558EVM

DAC7558EVM Specifications

DAC7558EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC7558.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
73,50 USD
73,50 USD
10
69,82 USD
698,25 USD
100
66,15 USD
6 615,00 USD
500
62,48 USD
31 237,50 USD
1000
58,80 USD
58 800,00 USD
Top