DAC5687EVM Overview

This product is categorized as Evaluation Boards Type: DAC This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the DAC5687. SMA interface type

DAC5687EVM Image

DAC5687EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5687EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of DAC5687
  • Interface-Type SMA

DAC5687EVM

DAC5687EVM Specifications

DAC5687EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC5687

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
191,91 USD
191,91 USD
10
182,31 USD
1 823,14 USD
100
172,72 USD
17 271,87 USD
500
163,12 USD
81 561,60 USD
1000
153,53 USD
153 527,80 USD