DAC5672EVM

Mfr. #: DAC5672EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR DAC5672
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DAC5672EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5672EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This tool is designed for the DAC5672. I2C SMA interface type

DAC5672EVM Image

DAC5672EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5672EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Tool-Is-For-Evaluation-Of DAC5672
  • Interface-Type I2C SMA

DAC5672EVM

DAC5672EVM Specifications

DAC5672EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC5672

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
223,50 USD
223,50 USD
10
212,32 USD
2 123,25 USD
100
201,15 USD
20 115,00 USD
500
189,98 USD
94 987,50 USD
1000
178,80 USD
178 800,00 USD
Top