DAC1220EVM

Mfr. #: DAC1220EVM
Produttore: Texas Instruments
Descrizione: MODULE EVALUATION FOR DAC1220
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: DAC1220EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC1220EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DAC1220. SPI interface type

DAC1220EVM Image

DAC1220EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC1220EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DAC1220
  • Interface-Type SPI

DAC1220EVM

DAC1220EVM Specifications

DAC1220EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC1220.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
73,50 USD
73,50 USD
10
69,82 USD
698,25 USD
100
66,15 USD
6 615,00 USD
500
62,48 USD
31 237,50 USD
1000
58,80 USD
58 800,00 USD
Top