CDCS502PERF-EVM

Mfr. #: CDCS502PERF-EVM
Produttore: Texas Instruments
Descrizione: EVAL PERFORMANCE MOD FOR CDCS502
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: CDCS502PERF-EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCS502PERF-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Generators Bulk is the packaging method for this product This product's 8 MHz to 108 MHz range is 0Hz to 2.2GHz. The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDCS502 Minimum operating temperature: - 30 C This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDCS502. USB interface type

CDCS502PERF-EVM Image

CDCS502PERF-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCS502PERF-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Generators
  • Packaging Bulk
  • Frequency 8 MHz to 108 MHz
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCS502
  • Minimum-Operating-Temperature - 30 C
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDCS502
  • Interface-Type USB

CDCS502PERF-EVM

CDCS502PERF-EVM Specifications

CDCS502PERF-EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Generators.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 8 MHz to 108 MHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Generator.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCS502.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 30 C

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCS502.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
148,50 USD
148,50 USD
10
141,08 USD
1 410,75 USD
100
133,65 USD
13 365,00 USD
500
126,22 USD
63 112,50 USD
1000
118,80 USD
118 800,00 USD
Top