CDCLVP2104EVM

Mfr. #: CDCLVP2104EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR CDCLVP2104
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: CDCLVP2104EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP2104EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: 4 Inputs, 8 Outputs IC package type: CDCLVP2104 This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP2104.

CDCLVP2104EVM Image

CDCLVP2104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP2104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer / Driver / Receiver / Translator
  • Primary-Attributes 4 Inputs, 8 Outputs
  • Embedded No
  • Utilized-IC-Part CDCLVP2104
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP2104

CDCLVP2104EVM

CDCLVP2104EVM Specifications

CDCLVP2104EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Buffers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 200 MHz 2 GHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer / Driver / Receiver / Translator.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 4 Inputs, 8 Outputs

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCLVP2104.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.375 V to 3.6 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCLVP2104.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
172,52 USD
172,52 USD
10
163,89 USD
1 638,89 USD
100
155,26 USD
15 526,35 USD
500
146,64 USD
73 318,90 USD
1000
138,01 USD
138 012,00 USD
Top