CDCE62005EVM

Mfr. #: CDCE62005EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR CDCE62005
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: CDCE62005EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE62005EVM Overview

Product belongs to the CDCE62005 series. This product is categorized as Evaluation Modules Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 1.5 GHz range is 0Hz to 2.2GHz. The Timing, Frequency Synthesizer is the Main-Purpose. Primary-Attributes: 3 Inputs, 10 Outputs IC package type: CDCE62005 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDCE62005. USB interface type

CDCE62005EVM Image

CDCE62005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE62005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series CDCE62005
  • Product Evaluation Modules
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 1.5 GHz
  • Main-Purpose Timing, Frequency Synthesizer
  • Primary-Attributes 3 Inputs, 10 Outputs
  • Embedded No
  • Utilized-IC-Part CDCE62005
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDCE62005
  • Interface-Type USB

CDCE62005EVM

CDCE62005EVM Specifications

CDCE62005EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is CDCE62005.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Frequency Synthesizers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 1.5 GHz

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Frequency Synthesizer.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 3 Inputs, 10 Outputs.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCE62005.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCE62005.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
298,50 USD
298,50 USD
10
283,58 USD
2 835,75 USD
100
268,65 USD
26 865,00 USD
500
253,72 USD
126 862,50 USD
1000
238,80 USD
238 800,00 USD
Top