CDC3S04EVM

Mfr. #: CDC3S04EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR CDC3S04
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: CDC3S04EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDC3S04EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 52 MHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDC3S04 Minimum operating temperature: - 30 C This product operates at a 2.2 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDC3S04. I2C interface type

CDC3S04EVM Image

CDC3S04EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDC3S04EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 52 MHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDC3S04
  • Minimum-Operating-Temperature - 30 C
  • Operating-Supply-Voltage 2.2 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDC3S04
  • Interface-Type I2C

CDC3S04EVM

CDC3S04EVM Specifications

CDC3S04EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 52 MHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDC3S04.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 30 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.2 V to 3.6 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDC3S04.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
172,52 USD
172,52 USD
10
163,89 USD
1 638,89 USD
100
155,26 USD
15 526,35 USD
500
146,64 USD
73 318,90 USD
1000
138,01 USD
138 012,00 USD
Top