BQ28400EVM

Mfr. #: BQ28400EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR BQ28400
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ28400EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ28400EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Battery Management The Power Management, Battery Gauge is the Main-Purpose. Primary-Attributes: Gas Gauge with Independent Overvoltage Protection IC package type: BQ28400, BQ29200 This tool is designed for the BQ28400 BQ29200. USB interface type

BQ28400EVM Image

BQ28400EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ28400EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Battery Management
  • Main-Purpose Power Management, Battery Gauge
  • Primary-Attributes Gas Gauge with Independent Overvoltage Protection
  • Embedded No
  • Utilized-IC-Part BQ28400, BQ29200
  • Tool-Is-For-Evaluation-Of BQ28400 BQ29200
  • Interface-Type USB

BQ28400EVM

BQ28400EVM Specifications

BQ28400EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Battery Gauge.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Gas Gauge with Independent Overvoltage Protection

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is BQ28400, BQ29200.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed BQ28400 BQ29200

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
153,75 USD
153,75 USD
10
146,06 USD
1 460,62 USD
100
138,38 USD
13 837,50 USD
500
130,69 USD
65 343,75 USD
1000
123,00 USD
123 000,00 USD
Top