BQ27531EVM

Mfr. #: BQ27531EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR BQ27531
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ27531EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ27531EVM Overview

Product belongs to the Impedance Track series. This product is categorized as Evaluation Modules Type: Battery Management This product is designed bq24192 amplifier. The Power Management, Fuel Gauge is the Main-Purpose. Primary-Attributes: - IC package type: BQ27531 This product is an Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell. This tool is designed for the BQ24192. I2C USB interface type Input Voltage Range: 4.2 V to 10 V

BQ27531EVM Image

BQ27531EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27531EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series Impedance Track
  • Product Evaluation Modules
  • Type Battery Management
  • For-Use-With bq24192
  • Main-Purpose Power Management, Fuel Gauge
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part BQ27531
  • Description-Function Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell
  • Tool-Is-For-Evaluation-Of BQ24192
  • Interface-Type I2C USB
  • Input-Voltage 4.2 V to 10 V

BQ27531EVM

BQ27531EVM Specifications

BQ27531EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is Impedance Track.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is bq24192.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Fuel Gauge.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is BQ27531.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed BQ24192

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C USB

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 4.2 V to 10 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
148,50 USD
148,50 USD
10
141,08 USD
1 410,75 USD
100
133,65 USD
13 365,00 USD
500
126,22 USD
63 112,50 USD
1000
118,80 USD
118 800,00 USD
Top