| Mfr. #: | BQ24257EVM-150 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | EVALUATION BOARD FOR BQ24257 |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | BQ24257EVM-150 Scheda dati |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Battery Management Bulk is the packaging method for this product This product is designed bq24250 bq24251 bq24257 amplifier. The Power Management, Battery Charger is the Main-Purpose. Primary-Attributes: - IC package type: BQ24257 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C Output voltage: 4.2 V This product is an Evaluation Module for the bq24250 bq24251 bq24257. This tool is designed for the bq24250 bq24251 bq24257. USB interface type Input Voltage Range: 4.35 V to 10.5 V Output current: 2 A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24257EVM-150 Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Battery Management.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the For-Use-With?
Q: The product For-Use-With is bq24250 bq24251 bq24257.
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Battery Charger
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is -.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is BQ24257.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 125 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: Is the cutoff frequency of the product Output-Voltage?
Q: Yes, the product's Output-Voltage is indeed 4.2 V
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed Evaluation Module for the bq24250 bq24251 bq24257
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is bq24250 bq24251 bq24257.
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed USB
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 4.35 V to 10.5 V.
A: What is the Output-Current of the product?
Q: The Output-Current of the product is 2 A.