BQ24195EVM-193

Mfr. #: BQ24195EVM-193
Produttore: Texas Instruments
Descrizione: MODULE EVAL FOR BQ24195-193
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ24195EVM-193 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24195EVM-193 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Battery Management The Power Management, Battery Charger is the Main-Purpose. Primary-Attributes: 1 Cell- Li-Ion IC package type: BQ24195 Output voltage: 0 V to 4.25 V This tool is designed for the BQ24195. Input Voltage Range: 3.9 V to 17 V Output current: 2.5 A

BQ24195EVM-193 Image

BQ24195EVM-193

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24195EVM-193 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Battery Management
  • Main-Purpose Power Management, Battery Charger
  • Primary-Attributes 1 Cell- Li-Ion
  • Embedded No
  • Utilized-IC-Part BQ24195
  • Output-Voltage 0 V to 4.25 V
  • Tool-Is-For-Evaluation-Of BQ24195
  • Input-Voltage 3.9 V to 17 V
  • Output-Current 2.5 A

BQ24195EVM-193

BQ24195EVM-193 Specifications

BQ24195EVM-193 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Battery Charger.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 1 Cell- Li-Ion.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is BQ24195.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 0 V to 4.25 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is BQ24195.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 3.9 V to 17 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 2.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
148,50 USD
148,50 USD
10
141,08 USD
1 410,75 USD
100
133,65 USD
13 365,00 USD
500
126,22 USD
63 112,50 USD
1000
118,80 USD
118 800,00 USD
Top