BQ24027EVM

Mfr. #: BQ24027EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR BQ24027
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: BQ24027EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24027EVM Overview

Product belongs to the bqTINY-II series. This product is categorized as Evaluation Boards Type: Battery Management The Power Management, Battery Charger is the Main-Purpose. Primary-Attributes: - IC package type: BQ24027 This tool is designed for the BQ24027. Our product measures 54.1 mm x 31.8 mm in dimensions for compact and convenient use. Input Voltage Range: 5 V

BQ24027EVM Image

BQ24027EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24027EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series bqTINY-II
  • Product Evaluation Boards
  • Type Battery Management
  • Main-Purpose Power Management, Battery Charger
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part BQ24027
  • Tool-Is-For-Evaluation-Of BQ24027
  • Dimensions 54.1 mm x 31.8 mm
  • Input-Voltage 5 V

BQ24027EVM

BQ24027EVM Specifications

BQ24027EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is bqTINY-II.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Battery Charger

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is BQ24027.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is BQ24027.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 54.1 mm x 31.8 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
0,00 USD
0,00 USD
10
0,00 USD
0,00 USD
100
0,00 USD
0,00 USD
500
0,00 USD
0,00 USD
1000
0,00 USD
0,00 USD
Top