| Mfr. #: | BOOSTXL-DRV8305EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | DRV8305N 3-Phase Motor Drive BoosterPack Evaluation Module |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | BOOSTXL-DRV8305EVM Scheda dati |


Product belongs to the NexFET series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed CSD18540Q5A LMR16006 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: CSD18540Q5B, DRV8305 This product is an DRV8305 3 phase motor drive boosterpack evaluation module. This tool is designed for the DRV8305. SPI interface type Input Voltage Range: 4.4 V to 45 V Output current: 15 A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BOOSTXL-DRV8305EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is NexFET.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: Is the cutoff frequency of the product For-Use-With?
Q: Yes, the product's For-Use-With is indeed CSD18540Q5A LMR16006
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is -.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is CSD18540Q5B, DRV8305.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is DRV8305 3 phase motor drive boosterpack evaluation module.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8305
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed SPI
A: Is the cutoff frequency of the product Input-Voltage?
Q: Yes, the product's Input-Voltage is indeed 4.4 V to 45 V
A: Is the cutoff frequency of the product Output-Current?
Q: Yes, the product's Output-Current is indeed 15 A