AMC6821EVM

Mfr. #: AMC6821EVM
Produttore: Texas Instruments
Descrizione: Sensor Development Tools Temperature Sensor Development Tools ANA MONITOR
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: AMC6821EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC6821EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Sensitivity: ±1°C Interface: I2C, SMBus Voltage Supply Range: 2.7 V ~ 5.5 V Temperature, Fan Controller Sensing range of -25°C ~ 100°C Included item: Board. IC package type: AMC6821 This product operates at a 3.3 V 5 V 12 V supply voltage for reliable performance. This tool is designed for the AMC6821.

AMC6821EVM Image

AMC6821EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC6821EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Sensitivity ±1°C
  • Interface I2C, SMBus
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature, Fan Controller
  • Sensing-Range -25°C ~ 100°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part AMC6821
  • Operating-Supply-Voltage 3.3 V 5 V 12 V
  • Tool-Is-For-Evaluation-Of AMC6821

AMC6821EVM

AMC6821EVM Specifications

AMC6821EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Temperature Sensors

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±1°C

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C, SMBus

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature, Fan Controller.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -25°C ~ 100°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed AMC6821

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V 5 V 12 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed AMC6821

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
141,02 USD
141,02 USD
10
133,97 USD
1 339,70 USD
100
126,92 USD
12 691,86 USD
500
119,87 USD
59 933,80 USD
1000
112,82 USD
112 816,60 USD
Top