AMC1210MB-EVM

Mfr. #: AMC1210MB-EVM
Produttore: Texas Instruments
Descrizione: KIT EVAL MOTHER BRD FOR AMC1210
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: AMC1210MB-EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1210MB-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards The Filters, Digital Filter Design is the Main-Purpose. Primary-Attributes: - IC package type: AMC1210 This product operates at a 5 V to 7 V supply voltage for reliable performance. This product is an Quad digital filter for second order delta sigma modulator evaluation board. This tool is designed for the AMC1210. Frequency range from 22 MHz

AMC1210MB-EVM Image

AMC1210MB-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1210MB-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Main-Purpose Filters, Digital Filter Design
  • Primary-Attributes -
  • Embedded Yes, MCU, 32-Bit
  • Utilized-IC-Part AMC1210
  • Operating-Supply-Voltage 5 V to 7 V
  • Description-Function Quad digital filter for second order delta sigma modulator evaluation board
  • Tool-Is-For-Evaluation-Of AMC1210
  • Cutoff-Frequency 22 MHz

AMC1210MB-EVM

AMC1210MB-EVM Specifications

AMC1210MB-EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Filters, Digital Filter Design

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AMC1210.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V to 7 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Quad digital filter for second order delta sigma modulator evaluation board.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is AMC1210.

  • A: Is the cutoff frequency of the product Cutoff-Frequency?

    Q: Yes, the product's Cutoff-Frequency is indeed 22 MHz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
223,50 USD
223,50 USD
10
212,32 USD
2 123,25 USD
100
201,15 USD
20 115,00 USD
500
189,98 USD
94 987,50 USD
1000
178,80 USD
178 800,00 USD
Top