AFE4490SPO2EVM

Mfr. #: AFE4490SPO2EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE AFE4490
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: AFE4490SPO2EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE4490SPO2EVM Overview

Product belongs to the - series. This product is categorized as Development Boards Type: Ultrasound AFE This product is designed AFE4400 AFE4490 amplifier. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: Medical Pulse Oximeter Applications IC package type: AFE4490 This product operates at a 2 V to 3.6 V supply voltage for reliable performance. This tool is designed for the AFE4400 AFE4490. USB interface type

AFE4490SPO2EVM Image

AFE4490SPO2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE4490SPO2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Development Boards
  • Type Ultrasound AFE
  • For-Use-With AFE4400 AFE4490
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes Medical Pulse Oximeter Applications
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part AFE4490
  • Operating-Supply-Voltage 2 V to 3.6 V
  • Tool-Is-For-Evaluation-Of AFE4400 AFE4490
  • Interface-Type USB

AFE4490SPO2EVM

AFE4490SPO2EVM Specifications

AFE4490SPO2EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Development Boards

  • A: At what frequency does the Type?

    Q: The product Type is Ultrasound AFE.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is AFE4400 AFE4490.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Medical Pulse Oximeter Applications.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE4490.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2 V to 3.6 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is AFE4400 AFE4490.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
223,50 USD
223,50 USD
10
212,32 USD
2 123,25 USD
100
201,15 USD
20 115,00 USD
500
189,98 USD
94 987,50 USD
1000
178,80 USD
178 800,00 USD
Top