ADS8556EVM

Mfr. #: ADS8556EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR ADS8556
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS8556EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8556EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 450k, 630k. Data-Interface: Serial, Parallel 16 bits 6 units Input range: ±4 x VREF Included item: Board. IC package type: ADS8556 This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the ADS8556 ADS8557 ADS8558. SMA interface type

ADS8556EVM Image

ADS8556EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8556EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 450k, 630k
  • Data-Interface Serial, Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 6
  • Input-Range ±4 x VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8556
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of ADS8556 ADS8557 ADS8558
  • Interface-Type SMA

ADS8556EVM

ADS8556EVM Specifications

ADS8556EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 450k, 630k

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial, Parallel

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 16.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 6

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is ±4 x VREF.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8556.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V to 15 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8556 ADS8557 ADS8558

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
148,50 USD
148,50 USD
10
141,08 USD
1 410,75 USD
100
133,65 USD
13 365,00 USD
500
126,22 USD
63 112,50 USD
1000
118,80 USD
118 800,00 USD
Top