ADS8484EVM

Mfr. #: ADS8484EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR ADS8484
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS8484EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8484EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 1.25M. Data-Interface: Parallel 18 bits 1 units Input range: ±VREF Included item: Board. IC package type: ADS8484 This product operates at a 3 V to 4.2 V supply voltage for reliable performance. This tool is designed for the ADS8484.

ADS8484EVM Image

ADS8484EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8484EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 1.25M
  • Data-Interface Parallel
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range ±VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8484
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 3 V to 4.2 V
  • Tool-Is-For-Evaluation-Of ADS8484

ADS8484EVM

ADS8484EVM Specifications

ADS8484EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 1.25M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 18

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed ±VREF

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS8484

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3 V to 4.2 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8484

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
114,63 USD
114,63 USD
10
108,90 USD
1 088,98 USD
100
103,17 USD
10 316,70 USD
500
97,44 USD
48 717,75 USD
1000
91,70 USD
91 704,00 USD
Top