ADS8380EVM

Mfr. #: ADS8380EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR ADS8380
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS8380EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8380EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 600k. Data-Interface: Serial 18 bits 1 units Input range: 0 ~ 4.2 V Included item: Board. IC package type: ADS8380 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8380. SMA interface type

ADS8380EVM Image

ADS8380EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8380EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 600k
  • Data-Interface Serial
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.2 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8380
  • Power-Typ-Conditions 115mW @ 600kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8380
  • Interface-Type SMA

ADS8380EVM

ADS8380EVM Specifications

ADS8380EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 600k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 18.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ 4.2 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8380.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8380.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
111,26 USD
111,26 USD
10
105,69 USD
1 056,92 USD
100
100,13 USD
10 012,95 USD
500
94,57 USD
47 283,40 USD
1000
89,00 USD
89 004,00 USD
Top