ADS8371EVM

Mfr. #: ADS8371EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR ADS8371
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS8371EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8371EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 750k. Data-Interface: Parallel 16 bits 1 units Input range: 0 ~ 4.096 V Included item: Board. IC package type: ADS8371 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8371.

ADS8371EVM Image

ADS8371EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8371EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 750k
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.096 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8371
  • Power-Typ-Conditions 130mW @ 750kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8371

ADS8371EVM

ADS8371EVM Specifications

ADS8371EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 750k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ 4.096 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8371.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS8371.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
114,63 USD
114,63 USD
10
108,90 USD
1 088,98 USD
100
103,17 USD
10 316,70 USD
500
97,44 USD
48 717,75 USD
1000
91,70 USD
91 704,00 USD
Top