ADS8321EVM-PDK

Mfr. #: ADS8321EVM-PDK
Produttore: Texas Instruments
Descrizione: PERFORMANCE DEV KIT FOR ADS8321
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS8321EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8321EVM-PDK Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 100k. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ 5 V Included item: 2 Boards. IC package type: ADS8321 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8321.

ADS8321EVM-PDK Image

ADS8321EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8321EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 100k
  • Data-Interface SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents 2 Boards
  • Utilized-IC-Part ADS8321
  • Power-Typ-Conditions 5.5mW @ 100kSPS
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8321

ADS8321EVM-PDK

ADS8321EVM-PDK Specifications

ADS8321EVM-PDK FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 100k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is SPI.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 16.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8321.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8321

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
172,52 USD
172,52 USD
10
163,89 USD
1 638,89 USD
100
155,26 USD
15 526,35 USD
500
146,64 USD
73 318,90 USD
1000
138,01 USD
138 012,00 USD
Top