ADS8317EVM

Mfr. #: ADS8317EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR ADS8317
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS8317EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8317EVM Overview

Product belongs to the microPOWER series. This product's 250k. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS8317

ADS8317EVM Image

ADS8317EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8317EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Sampling-Rate-Per-Second 250k
  • Data-Interface SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8317
  • Power-Typ-Conditions -

ADS8317EVM

ADS8317EVM Specifications

ADS8317EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is microPOWER.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 250k

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed SPI

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8317.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
96,70 USD
96,70 USD
10
91,87 USD
918,70 USD
100
87,03 USD
8 703,45 USD
500
82,20 USD
41 099,65 USD
1000
77,36 USD
77 364,00 USD
Top