ADS7845EVM

Mfr. #: ADS7845EVM
Produttore: Texas Instruments
Descrizione: MODULE EVAL FOR ADS7845
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS7845EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7845EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 5-Wire Resistive Touch Screen Controller, Serial Interface, 12-Bit ADC IC package type: ADS7845 This tool is designed for the ADS7845. I2C SPI interface type

ADS7845EVM Image

ADS7845EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7845EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 5-Wire Resistive Touch Screen Controller, Serial Interface, 12-Bit ADC
  • Embedded No
  • Utilized-IC-Part ADS7845
  • Tool-Is-For-Evaluation-Of ADS7845
  • Interface-Type I2C SPI

ADS7845EVM

ADS7845EVM Specifications

ADS7845EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Touch Screen Controller.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 5-Wire Resistive Touch Screen Controller, Serial Interface, 12-Bit ADC.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS7845.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS7845.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top