| Mfr. #: | ADS7834EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | EVAL MOD FOR ADS7834 |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | ADS7834EVM Scheda dati |


Product belongs to the - series. This product's 500k. Data-Interface: Serial 12 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS7834

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7834EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?
Q: Yes, the product's Sampling-Rate-Per-Second is indeed 500k
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 12.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: At what frequency does the Input-Range?
Q: The product Input-Range is 0 ~ VREF.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS7834.