ADS62P28EVM

Mfr. #: ADS62P28EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR ADS62P28
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS62P28EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS62P28EVM Overview

Product belongs to the - series. This product's 210M. Data-Interface: LVDS - Parallel, Serial 12 bits 2 units Input range: - Included item: Board. IC package type: ADS62P28

ADS62P28EVM Image

ADS62P28EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS62P28EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 210M
  • Data-Interface LVDS - Parallel, Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range -
  • Supplied-Contents Board
  • Utilized-IC-Part ADS62P28
  • Power-Typ-Conditions -

ADS62P28EVM

ADS62P28EVM Specifications

ADS62P28EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 210M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is LVDS - Parallel, Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS62P28.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
0,00 USD
0,00 USD
10
0,00 USD
0,00 USD
100
0,00 USD
0,00 USD
500
0,00 USD
0,00 USD
1000
0,00 USD
0,00 USD
Top