| Mfr. #: | ADS5547EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | ADS5547EVM |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | ADS5547EVM Scheda dati |


Product belongs to the - series. This product's 210M. Data-Interface: Serial, Parallel 14 bits 1 units Input range: 1 ~ 2 Vpp Included item: Board. IC package type: ADS5547

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5547EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 210M.
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is Serial, Parallel.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 14.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 1 ~ 2 Vpp.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed ADS5547