ADS5527EVM

Mfr. #: ADS5527EVM
Produttore: Texas Instruments
Descrizione: ADS5527EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS5527EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5527EVM Overview

Product belongs to the - series. This product's 210M. Data-Interface: Serial, Parallel 12 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS5527

ADS5527EVM Image

ADS5527EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5527EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 210M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5527
  • Power-Typ-Conditions 1.23W @ 210MSPS

ADS5527EVM

ADS5527EVM Specifications

ADS5527EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 210M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5527.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
0,00 USD
0,00 USD
10
0,00 USD
0,00 USD
100
0,00 USD
0,00 USD
500
0,00 USD
0,00 USD
1000
0,00 USD
0,00 USD
Top