ADS5400EVM

Mfr. #: ADS5400EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR ADS5400
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS5400EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5400EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 1G. Data-Interface: LVDS - Serial 12 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS5400 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5400.

ADS5400EVM Image

ADS5400EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5400EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 1G
  • Data-Interface LVDS - Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5400
  • Power-Typ-Conditions 2.45W @ 1GSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5400

ADS5400EVM

ADS5400EVM Specifications

ADS5400EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 1G.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Serial

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5400.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS5400.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
2,00 USD
2,00 USD
10
2,00 USD
20,00 USD
100
2,00 USD
200,00 USD
500
1,00 USD
500,00 USD
1000
1,00 USD
1 000,00 USD
Top