Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 65M. Data-Interface: Serial 12 bits 8 units Input range: 2.2 Vpp Included item: Board, Cable. IC package type: ADS5272 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the ADS5272.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5272EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 65M.
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed Serial
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 12.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 8.
A: Is the cutoff frequency of the product Input-Range?
Q: Yes, the product's Input-Range is indeed 2.2 Vpp
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board, Cable.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS5272.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is ADS5272.