ADS5231EVM

Mfr. #: ADS5231EVM
Produttore: Texas Instruments
Descrizione: ADS5231EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS5231EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5231EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 40M. Data-Interface: Serial 12 bits 2 units Input range: 1.5 ~ 2 Vpp Included item: Board. IC package type: ADS5231 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5231.

ADS5231EVM Image

ADS5231EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5231EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 40M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1.5 ~ 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5231
  • Power-Typ-Conditions 320mW @ 40MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5231

ADS5231EVM

ADS5231EVM Specifications

ADS5231EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 40M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1.5 ~ 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5231.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS5231.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
298,50 USD
298,50 USD
10
283,58 USD
2 835,75 USD
100
268,65 USD
26 865,00 USD
500
253,72 USD
126 862,50 USD
1000
238,80 USD
238 800,00 USD
Top