ADS42B49EVM

Mfr. #: ADS42B49EVM
Produttore: Texas Instruments
Descrizione: MODULE EVAL FOR ADS42B49
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS42B49EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42B49EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS42B49 amplifier. This product's 250M. Data-Interface: LVDS - Parallel, Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS42B49 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS42B49EVM evaluation module. This tool is designed for the ADS42B49. 330 mA is 92 nA. Parallel Serial interface type

ADS42B49EVM Image

ADS42B49EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42B49EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS42B49
  • Sampling-Rate-Per-Second 250M
  • Data-Interface LVDS - Parallel, Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS42B49
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS42B49EVM evaluation module
  • Tool-Is-For-Evaluation-Of ADS42B49
  • Operating-Supply-Current 330 mA
  • Interface-Type Parallel Serial

ADS42B49EVM

ADS42B49EVM Specifications

ADS42B49EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is ADS42B49.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 250M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is LVDS - Parallel, Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS42B49.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is ADS42B49EVM evaluation module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS42B49.

  • A: At what frequency does the Operating-Supply-Current?

    Q: The product Operating-Supply-Current is 330 mA.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is Parallel Serial.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
448,50 USD
448,50 USD
10
426,08 USD
4 260,75 USD
100
403,65 USD
40 365,00 USD
500
381,22 USD
190 612,50 USD
1000
358,80 USD
358 800,00 USD
Top