| Mfr. #: | ADS4246EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | EVAL MODULE FOR ADS4246 |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | ADS4246EVM Scheda dati |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 160M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4246 This tool is designed for the ADS4246. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4246EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?
Q: Yes, the product's Sampling-Rate-Per-Second is indeed 160M
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed CMOS, LVDS, Serial, Parallel
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 14.
A: Is the cutoff frequency of the product Number-of-A-D-Converters?
Q: Yes, the product's Number-of-A-D-Converters is indeed 2
A: At what frequency does the Input-Range?
Q: The product Input-Range is 2 Vpp.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS4246.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS4246
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is USB.