ADS1626EVM

Mfr. #: ADS1626EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR ADS1626
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS1626EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1626EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 1.25M. Data-Interface: Parallel 18 bits 1 units Input range: 0 ~ 4.7 V Included item: Board. IC package type: ADS1626 This product operates at a 8 V to 40 V supply voltage for reliable performance. This tool is designed for the ADS1626.

ADS1626EVM Image

ADS1626EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1626EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 1.25M
  • Data-Interface Parallel
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.7 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS1626
  • Power-Typ-Conditions 515mW @ 1.25MSPS, 5 V AVDD
  • Operating-Supply-Voltage 8 V to 40 V
  • Tool-Is-For-Evaluation-Of ADS1626

ADS1626EVM

ADS1626EVM Specifications

ADS1626EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 1.25M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 18

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 4.7 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS1626

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 8 V to 40 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS1626.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
242,43 USD
242,43 USD
10
230,31 USD
2 303,08 USD
100
218,19 USD
21 818,70 USD
500
206,07 USD
103 032,75 USD
1000
193,94 USD
193 944,00 USD
Top