ADS1278EVM

Mfr. #: ADS1278EVM
Produttore: Texas Instruments
Descrizione: ADS1278EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS1278EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1278EVM Overview

Product belongs to the - series. This product's 128k. Data-Interface: SPI 24 bits 8 units Input range: ±2.5 V Included item: Board. IC package type: ADS1278

ADS1278EVM Image

ADS1278EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1278EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 128k
  • Data-Interface SPI
  • Number-of-Bits 24
  • Number-of-A-D-Converters 8
  • Input-Range ±2.5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS1278
  • Power-Typ-Conditions 31mW @ 52kSPS

ADS1278EVM

ADS1278EVM Specifications

ADS1278EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 128k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed SPI

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 24.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 8.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is ±2.5 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS1278.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
0,00 USD
0,00 USD
10
0,00 USD
0,00 USD
100
0,00 USD
0,00 USD
500
0,00 USD
0,00 USD
1000
0,00 USD
0,00 USD
Top