ADS1274EVM-PDK

Mfr. #: ADS1274EVM-PDK
Produttore: Texas Instruments
Descrizione: KIT PERFORMANCE DEV FOR ADS1274
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS1274EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1274EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 128k. Data-Interface: SPI 24 bits 4 units Input range: ±VREF Included item: 2 Boards. IC package type: ADS1274 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the ADS1274. USB interface type

ADS1274EVM-PDK Image

ADS1274EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1274EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 128k
  • Data-Interface SPI
  • Number-of-Bits 24
  • Number-of-A-D-Converters 4
  • Input-Range ±VREF
  • Supplied-Contents 2 Boards
  • Utilized-IC-Part ADS1274
  • Power-Typ-Conditions 31mW @ 52kSPS
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of ADS1274
  • Interface-Type USB

ADS1274EVM-PDK

ADS1274EVM-PDK Specifications

ADS1274EVM-PDK FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 128k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed SPI

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 24.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 4.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed ±VREF

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS1274

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V to 3.3 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS1274.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
223,50 USD
223,50 USD
10
212,32 USD
2 123,25 USD
100
201,15 USD
20 115,00 USD
500
189,98 USD
94 987,50 USD
1000
178,80 USD
178 800,00 USD
Top