ADS1015EVM-PDK

Mfr. #: ADS1015EVM-PDK
Produttore: Texas Instruments
Descrizione: KIT DEMO FOR ADS1015
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADS1015EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1015EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 3.3k. Data-Interface: I2C, Serial 12 bits 1 units Input range: - Included item: 2 Boards. IC package type: ADS1015 This product operates at a 2 V to 5.5 V supply voltage for reliable performance. This tool is designed for the ADS1015. USB interface type

ADS1015EVM-PDK Image

ADS1015EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1015EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 3.3k
  • Data-Interface I2C, Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range -
  • Supplied-Contents 2 Boards
  • Utilized-IC-Part ADS1015
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 2 V to 5.5 V
  • Tool-Is-For-Evaluation-Of ADS1015
  • Interface-Type USB

ADS1015EVM-PDK

ADS1015EVM-PDK Specifications

ADS1015EVM-PDK FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 3.3k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed I2C, Serial

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS1015.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2 V to 5.5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS1015

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
114,63 USD
114,63 USD
10
108,90 USD
1 088,98 USD
100
103,17 USD
10 316,70 USD
500
97,44 USD
48 717,75 USD
1000
91,70 USD
91 704,00 USD
Top