ADC3443EVM

Mfr. #: ADC3443EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE ADC3443
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADC3443EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3443EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product This product's 80M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3443

ADC3443EVM Image

ADC3443EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3443EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Packaging Bulk
  • Sampling-Rate-Per-Second 80M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3443
  • Power-Typ-Conditions 288mW @ 80MSPS

ADC3443EVM

ADC3443EVM Specifications

ADC3443EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 80M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is LVDS - Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 4.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADC3443.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
438,81 USD
438,81 USD
10
416,86 USD
4 168,65 USD
100
394,92 USD
39 492,47 USD
500
372,98 USD
186 492,20 USD
1000
351,04 USD
351 044,20 USD
Top