ADC3424EVM

Mfr. #: ADC3424EVM
Produttore: Texas Instruments
Descrizione: EVAL BOARD FOR ADC3424
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADC3424EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3424EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product This product's 125M. Data-Interface: LVDS - Serial 12 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3424

ADC3424EVM Image

ADC3424EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3424EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Packaging Bulk
  • Sampling-Rate-Per-Second 125M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3424
  • Power-Typ-Conditions 391mW @ 125MSPS

ADC3424EVM

ADC3424EVM Specifications

ADC3424EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 125M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is LVDS - Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 4

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADC3424

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
448,50 USD
448,50 USD
10
426,08 USD
4 260,75 USD
100
403,65 USD
40 365,00 USD
500
381,22 USD
190 612,50 USD
1000
358,80 USD
358 800,00 USD
Top