ADC3243EVM

Mfr. #: ADC3243EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE ADC3243
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: ADC3243EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3243EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 80M. Data-Interface: LVDS - Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC3243 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3243 evaluation module. This tool is designed for the ADC3243. Serial LVDS interface type

ADC3243EVM Image

ADC3243EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3243EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 80M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3243
  • Power-Typ-Conditions 183mW @ 80MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function ADC3243 evaluation module
  • Tool-Is-For-Evaluation-Of ADC3243
  • Interface-Type Serial LVDS

ADC3243EVM

ADC3243EVM Specifications

ADC3243EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 80M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Serial

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADC3243

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is ADC3243 evaluation module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADC3243.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is Serial LVDS.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
448,50 USD
448,50 USD
10
426,08 USD
4 260,75 USD
100
403,65 USD
40 365,00 USD
500
381,22 USD
190 612,50 USD
1000
358,80 USD
358 800,00 USD
Top